Lokasi pemasangan paip pembentungan di sepanjang Jalan Kosas 3/9
Kerja pemasangan paip pembentungan di persimpangan antara Jalan Kosas 3/9 dan jalan Kosas 3/5
Hydraulic jacking system
- These machines also have a small site footprint which allows them to be installed in the tightest of site areas. The jacking frame and most of the equipment (except for powerpack) will fit inside a 2.1m diameter launch shaft. These machines have most commonly been used in infill sewerage and reticulation works as they can worked uninterrupted in back or front yards, footpaths and traffic islands with minimal fuss.
Bagaimana kaedah pemasangan paip ini di jalankan? Ini adalah antara kaedah yang sama seperti yang terdapat di web site ini : http://robcarr.com.au/pages/microtunnelling.html